TERZO VALICO DEI GIOVI – GENOVA JUNCTION

Home > Success stories > TERZO VALICO DEI GIOVI – GENOVA JUNCTION

EXCAVATION CONSOLIDATION AND REINFORCEMENT

2023

GENOVA - LIGURIA - ITALY

Rete Ferroviaria Italiana (RFI)

COCIV (WeBuild)

COCIV / Rocksoil

TERZO VALICO DEI GIOVI – GENOVA JUNCTION

Problem

The Terzo Valico dei Giovi is an ambitious project aimed at enhancing the Italian railway network, particularly the Genoa Node – Campasso Route. This initiative is crucial in improving both national and international connectivity, facilitating the transportation of goods and passengers. However, the excavation phase has encountered substantial geological complexities, resulting in significant challenges. The instability of the mass and the distress of the primary lining have necessitated the installation of struts to ensure stability at the excavation front and prevent delays in project progression. A primary focus is on mitigating risks for workers and expediting the primary lining phase to ensure that operations continue without impediment. These challenges not only impact production but also raise concerns regarding the safety and timeliness of ongoing operations.

Solution

Maccaferri proposed an innovative approach involving Automated Tunnel Ribs HEB 300 complete with automated hinges and automated links (covering a length of 3.7 kilometers) along with fiberglass reinforced solutions (GFRP) pipes (installing 250,000 meters). The decision to adopt this solution was influenced by its distinct advantages. 

The automation of the Automated Tunnel Rib facilitated installation without manual labor at the front, whether during lifting or connecting to the preceding Automated Tunnel Rib using automated links. This method significantly contributed to the stability of the excavation, allowing the final linings to be positioned further from the front, thereby enhancing production rates. The uniqueness and advantages of our solution are evident. The automated installation, eliminating the necessity for onsite labor, ensures not only speed and precision in execution but, more importantly, a remarkable increase in worker safety. This streamlined process not only ensures operational efficiency but also maintains a high standard of accuracy, distinguishing our approach in terms of both safety and productivity.

Used Products

隧道-钢拱
隧道-钢拱
View
star
This site is registered on wpml.org as a development site. Switch to a production site key to remove this banner.