Problem

A 12 000m² warehouse for storage of thousands of tons of soya had to be built on of low bearing, silty, fine hydraulic fills which are up to 4m in depth at the Durban Harbour area. These hydraulic fills are underlain by silty sand horizons which are interspersed by sandy clay and sandy clayey silts, which vary from 2m to about 20m in thickness. Calcareous sandstone, soft shale and siltstones were also found at depths of between 25-27m below ground. The water table was at 1.6m below natural ground. The client needed the structure to be finished as quickly as possible. The challenge was to provide a suitable foundation to carry such huge loads, on such poor founding conditions, in the quickest time.

Solution

A raft foundation of Paralink ™ basal reinforcement was found to be the most cost-effective solution for this problem. Piled foundations would have served this purpose from a structural view point, but construction was going to take much longer than the client was willing to tolerate. Paralink ™reinforcement did not only offer a fast and sound engineering solution, but a cost analysis showed that this alternative provided a huge cost saving as well. Benefits •Reduced founding base direct costs in excess of 50% •Reduced construction program by months,enabling client to meet shipping deadline constraints. •Reduced overall capital outlay for the client.

Used Products

MonoAxial GeoGrids单轴土工格栅
MonoAxial GeoGrids单轴土工格栅
MonoAxial GeoGrids单轴土工格栅主要用于加固,其独特的结构能够提供必要的强度来加固填充材料以及稳定土壤颗粒。 单轴型的特点是在机械拉伸方面具有较好的抗拉强度,且CMD 性能降至最低View
star
This site is registered on wpml.org as a development site. Switch to a production site key to remove this banner.